During colder months, 2 component foam is very sensitive to temperature variances. Per product instructions, both tank temperatures need to be above 70°F (21°C) for at least 24 hours prior to use. All application surfaces should be clean/dry and above 60°F (16°C) prior to application. Variance outside of the recommended temperature can affect foam yield and performance.

Spray Foam House


I am an Architect in Toronto. I am designing a new roof addition to a row house building. Because of existing conditions and the shape of the new roof. It may be easiest to use closed cell spray foam within the areas of the joists. My question is when spray foam is used in this situation do I need to worry about how the joist members may be thermal bridges? It is not common to provide a little bit of rigid insulation to protect the joist members? The additional layer of outboard insulation will require an extra layer of plywood above the insulation which will add to cost.
Carefully examine the roof membrane (surface material) for cracks, tears, blisters, evidence of ponding, exposed foam, and open seams. If already coated, evaluate the condition of the coating. Pay particular attention to areas around roof penetrations (vents, skylights, pipes, etc), ponding areas, cracks in parapet walls, and the attachment of roof membranes to parapet walls. Roofs should be in good condition to warrant coating.

Roof Bond

×